Ground systems register
Ground kit
8 pieces of ground and factory hardware (cranes, launch mounts, stands, lifters) named by a sourced claim. Placement comes only from a claim that states a site. Nothing here is inferred.
-
HW01
4PL (four point lifter) 4PL
Last placed: Mega Bay 2 since 2026-10-14
2 claims
2026-10-14 transport 4PL (four point lifter) from SAN to MB2
The 4PL used for ship lifts moved from Sanchez into Mega Bay 2 and hoisted from its stand.
2026-10-14 identify hardware 4PL (four point lifter)
The 4PL used for ship lifts moved from Sanchez into Mega Bay 2 and hoisted from its stand.
-
HW02
Booster workstand booster-workstand
Last placed: KSC Turn Basin since 2026-09-05
2 claims
2026-09-05 transport Booster workstand, SHT ship aft frame from RR to TB
A new booster workstand for Gigabay and a Starship Horizontal Transport Ship Aft Frame moved from Roberts Road to the KSC Turn Basin, to ship to Starbase.
2026-09-05 identify hardware Booster workstand
A new booster workstand for Gigabay and a Starship Horizontal Transport Ship Aft Frame moved from Roberts Road to the KSC Turn Basin, to ship to Starbase.
-
HW03
Gigabay bridge crane gigabay-bridge-crane
Last placed: Gigabay (Starbase) since 2026-10-13
5 claims
2026-10-15 UNCONFIRMED note at GB-TX about gigabay-bridge-crane
USA Flag installed on the Gigabay bridge crane at Starbase.
2026-10-13 note at GB-TX about gigabay-bridge-crane
More bridge crane testing inside Gigabay.
2026-10-13 identify hardware Gigabay bridge crane
More bridge crane testing inside Gigabay.
2026-10-11 note at GB-TX about gigabay-bridge-crane
Gigabay large bridge crane received its working load limit sign: 420.
2026-10-11 identify hardware Gigabay bridge crane
Gigabay large bridge crane received its working load limit sign: 420.
-
HW04
First Gigabay bridge crane (site not stated) gigabay-first-bridge-crane
Last placed: Site not stated by any source.
1 claim
2026-10-15 UNCONFIRMED identify hardware First Gigabay bridge crane (site not stated)
LabPadre reports the first bridge crane in the Gigabay being lifted into position. The post does not say which Gigabay (Starbase or Florida).
-
HW05
OG can crusher og-can-crusher
Last placed: Massey's test site since 2026-10-08
2 claims
2026-10-08 transport OG can crusher to MAS
The original can crusher moved to Massey's.
2026-10-08 identify hardware OG can crusher
The original can crusher moved to Massey's.
-
HW06
Pad 1 orbital launch mount (rebuild) pad1-olm
Last placed: Starbase Pad 1 UNCONFIRMED
2 claims
2026-10-15 UNCONFIRMED identify hardware Pad 1 orbital launch mount (rebuild)
Identify the new Pad 1 orbital launch mount as hardware; its first leg went into the flame trench.
2026-10-15 UNCONFIRMED note at P1 about pad1-olm
The first of the new Pad 1 orbital launch mount legs was installed into the flame trench.
-
HW07
Ship Work Stand ship-work-stand
Last placed: KSC Turn Basin UNCONFIRMED
2 claims
2026-10-15 UNCONFIRMED note at TB about ship-work-stand
The Ship Work Stand was offloaded You'll Thank Me Later at the KSC turn basin.
2026-10-15 UNCONFIRMED identify hardware Ship Work Stand
Identify the Starship Ship Work Stand as hardware seen at the Florida turn basin.
-
HW08
SHT ship aft frame sht-ship-aft-frame
Last placed: KSC Turn Basin since 2026-09-05
2 claims
2026-09-05 transport Booster workstand, SHT ship aft frame from RR to TB
A new booster workstand for Gigabay and a Starship Horizontal Transport Ship Aft Frame moved from Roberts Road to the KSC Turn Basin, to ship to Starbase.
2026-09-05 identify hardware SHT ship aft frame
A new booster workstand for Gigabay and a Starship Horizontal Transport Ship Aft Frame moved from Roberts Road to the KSC Turn Basin, to ship to Starbase.