Starbase
Mega Bay 2 MB2
Ship stacking
- S44 A2:4 crib
Claims
- arrived
2026-10-14 transport 4PL (four point lifter) from SAN to MB2
The 4PL used for ship lifts moved from Sanchez into Mega Bay 2 and hoisted from its stand.
- arrived
2026-10-12 lift S40 to MB2
Ship 40 broken over and lifted vertical inside Mega Bay 2, its first tip-up since recovery, using two cranes and the SHT-SAF.
- arrived
2026-10-10 transport S42 from MAS to MB2
Ship 42 returned to Mega Bay 2 after its third round of testing at Massey's.
- departed
2026-10-09 transport S42 from MB2 to MAS
Ship 42 rolled to Massey's on the ship cryo stand after all 6 engines were removed.
- arrived
2026-10-05 roll S44 A2:4 to MB2
Ship 44 A2:4 rolled into Mega Bay 2.