Starbase
Sanchez lot SAN
Ground hardware and pad component assembly
Claims
- departed
2026-10-14 transport 4PL (four point lifter) from SAN to MB2
The 4PL used for ship lifts moved from Sanchez into Mega Bay 2 and hoisted from its stand.
- arrived
2026-10-10 transport S40 from PoB to SAN
Ship 40 offloaded from Forte and rolled overnight from the Port of Brownsville to the production site.