Starbase
Mega Bay 1 MB1
Booster stacking
- B24 A5:4 crib
- B24 A6:4 crib
- B24 CH4 landing tank crib
- B24 Transfer tube crib
- B24 LOX landing tank crib
Claims
- arrived
2026-10-14 roll B24 LOX-landing-tank from SFC to MB1
Booster 24 LOX landing tank took a long route from Starfactory into Mega Bay 1 for installation.
- departed
2026-10-13 transport B23 from MB1 to MAS
Booster 23 rolled from the production site to Massey's for its initial cryo proof testing.
- arrived
2026-10-12 lift B23 to MB1
Booster 23 lifted onto the booster cryo / thrust sim stand.
- arrived
2026-10-08 roll B24 transfer-tube from SFC to MB1
Booster 24 full transfer tube rolled into Mega Bay 1.
- arrived
2026-10-07 roll B24 CH4-landing-tank from SFC to MB1
Booster 24 methane landing tank and lower transfer tube rolled from Starfactory to Mega Bay 1.
- arrived
2026-10-07 roll B24 A6:4 from SFC to MB1
Booster 24 A6:4 rolled from Starfactory to Mega Bay 1.
- arrived
2026-10-02 roll B24 A5:4 from SFC to MB1
Booster 24 A5:4 rolled from Starfactory to Mega Bay 1. Initially misidentified as A6.